Sunday, March 01, 2009

Floating sub-floor job

This is the before shot

Work in progress

Here's the stapler


Danel (ace carpenter) shooting 72 staples to the sheet.


Friday, September 01, 2006


20 ft high ceiling Posted by Picasa

Wednesday, August 16, 2006


bathroom Posted by Picasa

closet details Posted by Picasa

Crown molding Posted by Picasa

Kitchen Posted by Picasa

ceiling frame Posted by Picasa

the planning room Posted by Picasa

scaffolding Posted by Picasa

nested studs Posted by Picasa

20 ft ceilings Posted by Picasa

Thursday, June 22, 2006


just a few wires Posted by Picasa

Satchico figuring it all out! Posted by Picasa

Ceiling system Posted by Picasa

Kitchen ceiling with ducts. Posted by Picasa

Framed wall stiffened with black iron runners, Posted by Picasa

Framed and ready for electric and plumbimg. Posted by Picasa

Devon's lunch time nap Posted by Picasa

Tuesday, May 23, 2006


composition in plaster, gyp board, compound, and paint.  Posted by Picasa

Tape job in progress Posted by Picasa

composit wall Posted by Picasa

curving soffit over stairs Posted by Picasa

underside of temporary platform made for working over the stairs. Posted by Picasa

Skinning the center kitchen collumn Posted by Picasa

Ceiling detail Posted by Picasa

taped and almost ready to paint.  Posted by Picasa

View of gallery from dining room Posted by Picasa

Saturday, May 20, 2006


Days of destruction. Posted by Picasa

Strange ceiling detail Posted by Picasa

Ripping it all up Posted by Picasa

Demo dust at new job. Posted by Picasa

Demo marks Posted by Picasa

Bench mark at new job Posted by Picasa

Marked for destruction. Posted by Picasa

Demo days at new job Posted by Picasa

Hole in ceiling Posted by Picasa

Satchko with dust mask. Posted by Picasa

Plastic tent enclosing site office and protecting the office from demo dust. Posted by Picasa

Wall prepped for finish Posted by Picasa

Plaster wall extended with gypsum board. Posted by Picasa

curver soffit at top of stairs Posted by Picasa

wall prepped for plaster skim Posted by Picasa

Bath prepped for stone. Posted by Picasa

wall repair Posted by Picasa

2nd coat Posted by Picasa

Hellon at work taping ceiling. Posted by Picasa

Conference about difficult area. Posted by Picasa

Plaster wall patched after electric BX installation. Posted by Picasa

Wednesday, May 10, 2006


Rail roaded sheets. Posted by Picasa

Measuring for the next sheet Posted by Picasa

cut outs for lights Posted by Picasa

putting up the rock Posted by Picasa

Sheathing the ceiling Posted by Picasa